Use cases › Running the wholesale cycle

Use case · Wholesale operations

A distributor’s daily reorder: which lines, from whom, how many

A regional distributor of industrial and building supplies stocks tens of thousands of products from hundreds of suppliers. Every day, buyers decide what to reorder: enough to avoid a stockout, not so much that cash sits on shelves. Minimum orders, pack sizes and price breaks turn each line into a menu of its own.

Anonymized use case. A composite of how businesses in this market work, from public sources. Not a HyperC customer or deployment; numbers in examples are illustrative.

01 · The business

Thousands of small bets a day

Distributors sit between manufacturers and the contractors, plants and shops that buy from them. Their service is availability — the part on the shelf today. Their risk is the part that sits on the shelf for a year. US wholesalers held $1,011.5 billion of inventory at the end of September 2026, 7.4% more than a year earlier (source below).

Each reorder is a small investment: margin on future sales, minus the cost of carrying the stock. And each can be placed several ways — a single box or the supplier’s minimum; the price break at 200 or at 500; the usual supplier or a cheaper one with a longer lead time.

Most distributors run this from their ERP’s min/max settings, spreadsheets and buyers’ experience. Newer tools forecast demand and draft purchase orders for a buyer to approve each morning.

How it is decided today

  • The ERP flags lines below their reorder point; buyers review the list every morning.
  • Order quantities follow min/max settings that are rarely revisited.
  • Price breaks and minimums are judged by eye: is the discount worth the extra stock?
  • Lines that must never run out are protected by habit rather than by rule.
02 · Where P34 fits

Each line is a menu of sizes and suppliers

A key is one line on one day; its rows are the ways to buy it — 200 units at $4.10 or 500 at $3.80, from the usual supplier or the slower, cheaper one. P34 picks at most one row per line, which is exactly how its quantity and cost alternatives work, and predicts profit over a fixed horizon, including what is left unsold at its end.

History is the distributor’s own: the reorder options it faced, what it bought, and what each line then sold, at what margin and after how long. Most of it is already in the ERP.

This is the menu shape of HyperC’s founding deployment — purchase decisions for a large Amazon wholesale reseller, in production since 2023 (company-reported) — applied to another trade. The day’s cash and the warehouse are shared by every line; the distributor’s declared rule applies them to P34’s plan.

What stays with people

  • Approving purchase orders
  • Supplier relationships, terms and negotiation
  • Service promises to key customers — lines that must never run out
  • New products and discontinued ones

The decision as P34 reads it

Part of the requestIn this business
Menu (now)Lines due for review: stock on hand and on order, each supplier’s price breaks, pack sizes, minimums and lead times
QuantityUnits ordered at a price break; 0 means not today
Historical menusPast reorder options per line, bought or not
OutcomesSales, margin and days in stock for what was bought
Business descriptionCarrying cost, freight, supplier terms, the horizon and the rule for stock still unsold at its end
AnswerA quantity and supplier per line, with predicted profit for the plan; buyers approve
03 · A worked example

Six lines on one morning’s list

The buyer has $19,000 of open-to-buy for the day. Each line can be bought in more than one way.

LineOptions on offerP34’s choiceAfter the cash ruleWhat drives it
PVC fittings, ¾ inBox of 100 at $0.62 · pallet of 2,000 at $0.48PalletPallet · $960Sells 1,500 a month; the break pays
Copper pipe, 15 mmUsual supplier, $9.20/m, 2 weeks · importer, $7.90/m, 9 weeks, min 1,000 mUsual, 400 mUsual · $3,680The cheaper import would sit too long
Circuit breakers, 20 APack of 12 at $11.40 · 120 at $10.10120120 · $1,212Steady contractor demand
Specialty sealantMinimum 240 at $8.75None—The last order took a year to sell
Insulation boardTruckload, 600 sheets at $21.50600600 · $12,900Winter demand ahead; space is free now
Safety glovesCase of 144 at $1.10 · 1,440 at $0.861,440144 · $158.40The bigger break no longer fits the cash
This morning5 of 6 lines$18,910.40of $19,000

✓ in the plan · – passed

Illustrative numbers, not a customer’s figures and not a P34 output: P34 chose one option per line. The cash rule fills the budget in order of predicted profit per dollar and steps the last line down to its smaller pack.

04 · Fit, honestly

Where it fits, and where it does not

Why it fits

  • Thousands of lines, each with several sizes and suppliers — the menu shape P34 was built on.
  • A complete history in the ERP: options, purchases, sales and days in stock.
  • Profit per line is computable: margin, carrying cost and what is left at the horizon.

What to watch

  • Service commitments are rules: lines that must never run out are set aside, not traded off.
  • A plan takes minutes — fine for a daily cycle, not for quoting a customer on the phone.
  • Supplier reliability changes; lead-time history must be current.
  • Very slow lines have little history each; P34 learns across similar lines.

History you need

  • Reorder options per line and day — sizes, prices, suppliers — bought or not
  • Sales, margin and days in stock for every purchase
  • Your carrying cost, freight, supplier terms and write-off rule
05 · How to test it

From a free check to a capped pilot

Nothing here needs a contract to start. Each step is a gate: stop at any of them.

01Check the dataBuild a request from a few months of your own records and validate it for free — columns, volume and history — before anything is metered.
02Replay the pastFit on last year’s ERP history and replay recent months; compare P34’s orders with your buyers’.
03Shadow testFor a month, put P34’s plan beside the morning list without ordering from it; compare stock and margin after.
04Capped pilotOrder one product group from the plan, buyers approving each line. Stop if service levels slip.
Industry context

Numbers from outside this page

About this use case
Anonymized composite. This use case describes a kind of business, not a company. It was written from public descriptions of how businesses in this market buy, sell and decide, and of the software they use today. No company or customer is named, and nothing here is a HyperC customer, deployment or result. The worked example uses illustrative numbers, not anyone’s figures and not a P34 output. P34 returns quantities and predicted profit for a plan; it places no orders, promises no outcome, and the business keeps every purchase, sale and contract decision.

Written 25 November 2026. If you run a business like this and something here is wrong, tell us — we correct use cases when operators do.